What was once a half bathroom has now been converted to a shower stall by BF.
There was the rerouting and soldering of pipes, jackhammering of the floor, mixing of concrete and much, much more.
At the start of the renovation, I thought we would have to hire a plumber to complete the shower stall project. Nope.
BF completed the shower installation all by himself. He never ceases to amaze me, except when he poses for the camera like this...
No comments:
Post a Comment